Project Description

We started working almost exclusively on Time Warner projects in 2011-2013. We worked on many projects for Time Warner including a very large loop around a large beach in Southern California. We Placed 2-3" HDPE conduit and placed boxes. Most of the construction took place in sidewalk areas, so there was a lot of concrete to replace, which was all self performed by S&S Directional Drilling, Inc.

  • Place 3" HDPE by HDD Method¬†
  • Box Placement
  • Hard Scape R&R